The WIPocalypse list of unfinished projects is due before the end of the year, only five days away. Once listed (aka "owned up to" ), we will work on them during the month, and check in each full moon to report on our progress. So as not to be late in listing (aka "procrastinating"), here is the list. If you want to check out WIPocalypse look here for information.
3. Asian wall hanging - 30% completed.
These are naked blocks, but the embroidery is finished on all of them. I want them together as a wall hanging, I just have to figure out how to do it.
1. Flower quilt - 60% finished.
This will be a 3-block wide by 4-block long wall hanging. I have completed the 12 blocks. They now have to be joined together and finished.
|
These are naked blocks, but the embroidery is finished on all of them. I want them together as a wall hanging, I just have to figure out how to do it.
4. Flag Project - 0% completed.
This is the flag of India which I have committed to stitching for the Flag Project. This is due at the end of January, so I'll be working on this first.
|
1 comment:
You will have your hands full, Diane! Good luck!
Post a Comment